Pneumatic Gas Pre-heater (Vortex Tube) with Switch Unit
| Application | Control-gas pre-heater (e.g., for pneumatic pilots) |
|---|---|
| Fully self-sufficient as preheating does not require any additional energy (Ranque-Hilsch effect) | |
| Simple construction | |
| Vortex tube without any moving interior parts | |
| Easy integration into existing gas pressure control systems | |
| Little tubing required | |
| Optionally with pneumatic control unit. Only required in stations where zero gas consumption is possible |
|
| Suitable for non-aggressive gases, other gases on enquiry | |
| SEP design according to PED | |
| Max. admissible pressure PS | = 100 bar |
| Max. operating pressure pmax | up to 100 bar |
| Max. temperature of housing tmax | approx. 60 °C at room temperature (approx. 20 °C) |
| The gas pre-heater RMG 901 is applicable with in the range pu ≥ 2 · pd+ 5. pu= inlet pressure in bar (over-pressure) pd= outlet pressure in bar (over-pressure) |
|
| Connection | Pipe connections according to DIN EN ISO 8434-1 (DIN 2353), PN 100, for pipe sizes 10 mm and 12 mm |
| All mechanical components of this device are without ignition sources. As such, they are not subject to ATEX 95 (94/9/EC). All electrical components used with this device fulfil the ATEX requirements. |