DeutschlandGroßbritannienPolenRusslandChina
Serving the Gas Industry Worldwide
RMGSitemapContact usImprint / Legal NoticeDruckenPDF  

Plant construction GOE 2000

Gas Odorising Plant GOE 2000

Application Operates on the injection principle
  Diaphragm pump controlled according to flow rate
  Conveyance of odoriser from interchangeable container on the principle of communicating pipes
  Interchangeable container according to DIN 30650
  With 17 or 35 l – backup container
  Unit on assembly plate
Max. back pressure 80 bar
Max. output Odorising up to 250,000 Nm³/h, depending on concentration of odoriser Options
  Continuous level measuring
  Flow monitors
  Odoriser-flow-rate measuring
  High pressure rinsing and venting device
Special designs Odorising plant with backup pump for manual switchover in case of operating pump failure
  Complete odorising plants (odorising plant and controlling device in cabinet) available at request

GOE 2000

Plant construction GOE 2000

Technical description

Operation & maintenance, spare parts

to product flash